Also, I worked on creating a small aluminum can melting forge. The bottom half is done and I didn't have enough plaster to make the lid, but maybe this weekend I'll be able to finish it up.
Wednesday, February 11, 2015
(02-10-2015) Sand blasting and forge creation
Also, I worked on creating a small aluminum can melting forge. The bottom half is done and I didn't have enough plaster to make the lid, but maybe this weekend I'll be able to finish it up.
Tuesday, February 03, 2015
(02-03-2015) Blondie is back on the road!
Last night the final parts arrived (upper strut bushing/bearings) and then Flash installed the new struts.
That was the last piece of the puzzle to get Blondie back on the road, so today I drove her to work as a shake down to see how things "feel". It seems to be great so far, a little vibration from the tires and wheels, but everything else seems great and no check engine lights or other warnings.
Thursday she goes in for a four wheel alignment, after that she should be fully road worthy again.
That was the last piece of the puzzle to get Blondie back on the road, so today I drove her to work as a shake down to see how things "feel". It seems to be great so far, a little vibration from the tires and wheels, but everything else seems great and no check engine lights or other warnings.
Thursday she goes in for a four wheel alignment, after that she should be fully road worthy again.
Subscribe to:
Posts (Atom)